Brea Marketplace

July 1st, 2009 by Webmaster

Rework 840,000 sq.ft. of sitework to accommodate a new layout involving the construction of vanilla shell masonry/wood framed buildings. Scope included slurry and parking lot restriping, modifying existing walkways, drive isles, parking stalls, utilities,…

  • Posted in
  • Comments Off on Brea Marketplace

America’s Tire

July 1st, 2009 by Webmaster

Remodel of an existing tire retailer including the addition of a new sales floor, office and high bay racking for the service center.

  • Posted in
  • Comments Off on America’s Tire

Crown City Medical

June 1st, 2009 by Webmaster

Tenant improvements for a high-end orthopedic medical office including six exam rooms, epidural room, physical therapy room, two owner offices and a reception area. The renovated space consists of ceramic tile throughout, plastic laminate…

  • Posted in
  • Comments Off on Crown City Medical

Elan Clubhouse

March 1st, 2009 by Webmaster

The scope of work for this wood structure consisted of stripping all drywall and finishes, structural steel, concrete, timber retrofit, restroom remodel, clubhouse refinishing, electrical, reconfiguration of walls, rework of ceilings and soffits and…

  • Posted in
  • Comments Off on Elan Clubhouse

SLAC Research Center

March 1st, 2009 by Webmaster

Demolition and over 5,200 sq.ft. of renovations specific to the first and second floors. Upgrades to the various laboratories and support spaces include new electrical and telephone/data rooms, repairs to the existing HVAC system,…

  • Posted in
  • Comments Off on SLAC Research Center

Zouves Fertility Center

February 1st, 2009 by Webmaster

Nearly half of the facility features a surgical suite fully equipped with an IVF lab, procedure rooms, patient recovery and a state-of-the-art back-up power system designed for the storage of embryos. A quarter of…

  • Posted in
  • Comments Off on Zouves Fertility Center

Shellmound

November 1st, 2008 by Webmaster

Scope included demolition, installation of new partitions and openings, related mechanical and electrical, and finishes. Various sitework requirements were included as well.

  • Posted in
  • Comments Off on Shellmound

AmerisourceBergen

November 1st, 2008 by Webmaster

New pharmaceutical distribution center with HVAC, security modifications and interior improvements to the office, production and receiving areas. Updates include new lighting, t-bar, flooring, a break room, restroom, data room, security based rollup doors,…

  • Posted in
  • Comments Off on AmerisourceBergen

Hansen Medical

October 1st, 2008 by Webmaster

Remodel of an existing building to accommodate a new state-of-the-art medical device manufacturing and research facility. This project featured a 5,000 sq.ft. class 10 clean room assembly, 16,000 sq.ft. of direct and indirect manufacturing…

  • Posted in
  • Comments Off on Hansen Medical

Heritage Bank of Commerce

September 1st, 2008 by Webmaster

Scope included demolition of both existing office suites and creating an open footprint typical for banking operations, complete with high-end finishes throughout.

  • Posted in
  • Comments Off on Heritage Bank of Commerce