America’s Tire
July 1st, 2009 by Webmaster
Remodel of an existing tire retailer including the addition of a new sales floor, office and high bay racking for the service center.
Crown City Medical
June 1st, 2009 by Webmaster
Tenant improvements for a high-end orthopedic medical office including six exam rooms, epidural room, physical therapy room, two owner offices and a reception area. The renovated space consists of ceramic tile throughout, plastic laminate…
Elan Clubhouse
March 1st, 2009 by Webmaster
The scope of work for this wood structure consisted of stripping all drywall and finishes, structural steel, concrete, timber retrofit, restroom remodel, clubhouse refinishing, electrical, reconfiguration of walls, rework of ceilings and soffits and…
SLAC Research Center
March 1st, 2009 by Webmaster
Demolition and over 5,200 sq.ft. of renovations specific to the first and second floors. Upgrades to the various laboratories and support spaces include new electrical and telephone/data rooms, repairs to the existing HVAC system,…
Zouves Fertility Center
February 1st, 2009 by Webmaster
Nearly half of the facility features a surgical suite fully equipped with an IVF lab, procedure rooms, patient recovery and a state-of-the-art back-up power system designed for the storage of embryos. A quarter of…
Shellmound
November 1st, 2008 by Webmaster
Scope included demolition, installation of new partitions and openings, related mechanical and electrical, and finishes. Various sitework requirements were included as well.
AmerisourceBergen
November 1st, 2008 by Webmaster
New pharmaceutical distribution center with HVAC, security modifications and interior improvements to the office, production and receiving areas. Updates include new lighting, t-bar, flooring, a break room, restroom, data room, security based rollup doors,…
Hansen Medical
October 1st, 2008 by Webmaster
Remodel of an existing building to accommodate a new state-of-the-art medical device manufacturing and research facility. This project featured a 5,000 sq.ft. class 10 clean room assembly, 16,000 sq.ft. of direct and indirect manufacturing…
Heritage Bank of Commerce
September 1st, 2008 by Webmaster
Scope included demolition of both existing office suites and creating an open footprint typical for banking operations, complete with high-end finishes throughout.
Stevens Creek Audi
August 1st, 2008 by Webmaster
Remodel of an existing auto dealership. Phase 1 included cosmetics with carpet, tile removal and replacement. Phase 2 included interior renovations to multiple areas. Service shop features all-new equipment, flooring, t-bar ceilings, electrical and…