Citibank

August 1st, 2008 by Webmaster

Scope of work included the installation of new offices, ATM machines, customer waiting areas and teller desks. Some of the locations adhere to CitiGroups’ new LEED design specifications in effort to obtain LEED certification.

  • Posted in
  • Comments Off on Citibank

SPI Shopping Center

August 1st, 2008 by Webmaster

Demolition of an existing Montgomery Wards building, as well as preparations for Target and four stick-frame warm shell buildings with conventional slab-on-grade foundation systems and perimeter-spread footings. Exterior finishes include stucco with elastomeric paint,…

  • Posted in
  • Comments Off on SPI Shopping Center

Holtorf Medical Group

August 1st, 2008 by Webmaster

Tenant improvements to convert an ground floor space into a private medical office within an existing two-story building. Scope included the installation of new electrical, mechanical and plumbing, as well as modifications to the…

  • Posted in
  • Comments Off on Holtorf Medical Group

West Marine

July 1st, 2008 by Webmaster

Scope required the upgrade of an unoccupied shell with new metal stud framed towers, cornice and a plaster façade with aluminum storefront and panels. The second phase involved moving an operational store into the…

  • Posted in
  • Comments Off on West Marine

City Place Center

July 1st, 2008 by Webmaster

This is an upscale, high-end shopping center featuring five ground-up, single story shell buildings. Building ‘A’ 7,900 sq.ft.; Building ‘B’ 7,900 sq.ft.; Building ‘D’ 9,000 sq.ft. Building ‘C’ is a 7,200 sq.ft. for a…

  • Posted in
  • Comments Off on City Place Center

Peninsula Building Materials

March 1st, 2008 by Webmaster

A majority of the new 10 acre site was used for building material storage, which was screened from public view by a 10ft wall. Scope included exterior masonry displays, pre-cast site walls, grading, paving,…

  • Posted in
  • Comments Off on Peninsula Building Materials

St. Francis Center

February 1st, 2008 by Webmaster

This three-story LEED Silver Certified non-profit building replaced an existing structure and houses a donation/food storage center on the ground floor, classrooms and social services on the second floor and three low income housing…

  • Posted in
  • Comments Off on St. Francis Center

Clayton Valley Center

November 1st, 2007 by Webmaster

Demo of existing shops with public utility resources and asbestos abatement. Shop 1B, 3, 4, 5 and Yardbirds include Facade removal and renovations. Pad 7 features two new retail and restaurant spaces spanning 5,500…

  • Posted in
  • Comments Off on Clayton Valley Center

990 Industrial

November 1st, 2007 by Webmaster

Scope features a new retail façade, roof screen, second floor office, elevator, upgraded electrical and mechanical systems, ADA compliance and parking upgrades.

  • Posted in
  • Comments Off on 990 Industrial

PetsMart / PetHotel

November 1st, 2007 by Webmaster

The tilt-up building required underground utilities and a multifaceted interior slab plan with complex slopes for proper drainage. The PetHotel features extensive millwork/floor coverings, two dog atriums (kennels), sound protected suites with TV’s, three…

  • Posted in
  • Comments Off on PetsMart / PetHotel