Sub-Zero Wolf

December 1st, 2004 by Webmaster

Project included new high-end offices, display center and a distribution center complete with loading dock and warehouse racking system.

  • Posted in
  • Comments Off on Sub-Zero Wolf

Highland Capital

October 1st, 2004 by Webmaster

Scope included a bathroom core, lounge, private offices, break room, and several conference rooms equipped with an AV system that incorporates video conferencing. The design included frameless glass, post and beams with a wood…

  • Posted in
  • Comments Off on Highland Capital

Zion Bank

October 1st, 2004 by Webmaster

Complete build-out of the top floor featuring full height glass offices in the center of the space, fabric wrap panels, and intricate casework. No right angles are found in this space. All the elements…

  • Posted in
  • Comments Off on Zion Bank

Costco Wholesale Depot

September 1st, 2004 by Webmaster

Remove and replace varies areas of existing concrete and existing asphalt throughout the Costco Wholesale Depot parking lot.

  • Posted in
  • Comments Off on Costco Wholesale Depot

Community Museum

March 1st, 2004 by Webmaster

Freshly painted, newly relocated and carefully restored to its original humble glory, the old Mathisen farmhouse assumes its new role as a local history museum. Targeted for demolition, the old farmhouse dates back to…

  • Posted in
  • Comments Off on Community Museum

Leading Banking Institution

February 1st, 2004 by Webmaster

Phase one included 56,000 square feet of office space, lobby, conference rooms and a fitness center, as well as a 12,000 square foot cafeteria capable of serving up to 1,000 people. The building received…

  • Posted in
  • Comments Off on Leading Banking Institution

Gideon Hausner School

August 1st, 2003 by Webmaster

The first building serves the elementary school students, the second building serves as the middle school, and the third building included faculty offices and the gymnasium.

  • Posted in
  • Comments Off on Gideon Hausner School

Escondido VIllage

December 1st, 2002 by Webmaster

Phase 1: two new four-story wood framed buildings with 236 studio units. Phase 2: two four-story wood framed buildings containing 326 studio units. Scope included a common building containing a computer cluster, laundry facility,…

  • Posted in
  • Comments Off on Escondido VIllage

Stanford Student Services

October 1st, 2002 by Webmaster

Ground-up building and turn-key tenant improvements for Stanford’s Career Development Center and Disability Resource Center.

  • Posted in
  • Comments Off on Stanford Student Services

Jasper Ridge

April 1st, 2002 by Webmaster

The Leslie Shao-Ming Sun Field Research Station at Jasper Ridge Biological Preserve features lab space, offices and classroom areas. Initially designed with an annual energy goal of net zero carbon emissions and to reduce the consumption…

  • Posted in
  • Comments Off on Jasper Ridge