Highland Capital

October 1st, 2004 by Webmaster

Scope included a bathroom core, lounge, private offices, break room, and several conference rooms equipped with an AV system that incorporates video conferencing. The design included frameless glass, post and beams with a wood…

  • Posted in
  • Comments Off on Highland Capital

Zion Bank

October 1st, 2004 by Webmaster

Complete build-out of the top floor featuring full height glass offices in the center of the space, fabric wrap panels, and intricate casework. No right angles are found in this space. All the elements…

  • Posted in
  • Comments Off on Zion Bank

Escondido VIllage

December 1st, 2002 by Webmaster

Phase 1: two new four-story wood framed buildings with 236 studio units. Phase 2: two four-story wood framed buildings containing 326 studio units. Scope included a common building containing a computer cluster, laundry facility,…

  • Posted in
  • Comments Off on Escondido VIllage

Snowcrest Village*

December 1st, 2001 by Webmaster

Construction of 30 condominiums situated over a parking structure. The property is located in a snow region near Kirkwood Village; which required unique architectural and designer touches. (*) Denotes projects built by W. L….

  • Posted in
  • Comments Off on Snowcrest Village*

Fire Station #11

December 1st, 2000 by Webmaster

The facility contains many features unique to a fire station including communication links, vehicle exhaust extraction, special equipment rooms and public access. A comfortable living space was also created for the on-duty firefighters featuring…

  • Posted in
  • Comments Off on Fire Station #11

Abbott Laboratories

December 1st, 1997 by Webmaster

A 260,000 square foot design-build project on a 21-acre site. The 105,000 square foot two-story office features a 20,000 square foot mezzanine, lab space, clean rooms, manufacturing, warehouse and distribution facilities for the global…

  • Posted in
  • Comments Off on Abbott Laboratories