Project Summary
The existing tri-level building consists of four inner columns with the second and third floors cantilevering outward from all four sides. The new design required extensive structural steel upgrades, interior and exterior cosmetic work, new interior TI work, a high end security system, a hybrid fire sprinkler system and new glazing throughout. The interior TI work included 21 branch offices, ATMs and Tellers, restrooms, employee lounge and conference room space. Site improvements spanning 1.5 acres include new light poles, parking lot resurfacing, drive-up teller canopy, electrical, pad mount generator, dumpster enclosure, monument signage and landscaping.
PROJECT TAGS
Select a category to learn more about this project's related areas of expertise and office(s).