Design-Build Electric Semi Truck Charging and Maintenance Facility
Sustainable Transportation Solutions
Expansion of the corporate office for an underground utilities contractor
The addition of two new buildings and removal of the existing office upon completion. The first building was a two-story pre-fabricated steel designed to serve as the company’s division headquarters; complete with offices, lobby, conference room and breakroom. An adjacent prefab structure serves as a storage/shop building to repair field trucks.
The project scope also included enclosures for an onsite carwash, a 10,000 gal. above-ground fuel dispensing tank, installation of a double gate entrance, and bioswales along the perimeter.